Asphalt Driveway Sealcoating
A fresh sealcoat protects your asphalt driveway from water, sun and road salt and brings back a clean, deep black finish. For homes in New Lenox, Lockport, Homer Glen, Mokena, Lemont and Frankfort, and for commercial lots. Now taking requests for next season.
Why seal an asphalt driveway
Asphalt is held together by a black binder. Sun, water, road salt and car fluids slowly dry that binder out. The surface fades to gray, small cracks open up, water gets in, and a few Chicago winters of freezing and thawing do the rest.
A sealcoat is a thin protective layer over the top that slows all of that down. According to SealMaster, a sealcoat manufacturer, sealing every two to three years protects the pavement from moisture, oil and UV damage and can more than double its life.

What’s included
Cleaning
Grass and weeds pulled from the edges and the whole surface swept and blown clean.
Crack filling
Cracks cleaned out and filled before any sealer goes down.
Oil spots
Oil and fluid stains cleaned and primed so the sealer bonds.
Two coats
Sealer applied over the whole driveway in two even coats.
Clean edges
Garage floor, walks, lawn and landscape beds protected while we work.
Blocked off to cure
The driveway is blocked off and we tell you when it’s ready to drive on.
When we sealcoat
Sealcoat needs warm, dry weather. SealMaster’s guidance is to apply it when it is at least 50°F and rising, with no rain expected for 24 hours. In the southwest suburbs that means late spring through early fall. Send a request now and we will look at the driveway and get you on the schedule for next season.
After the sealcoat
Keep cars and foot traffic off the driveway for at least 24 hours, and turn off any sprinklers that reach it until the sealer has cured. We will tell you when it is ready to use.
Commercial lots and HOA drives
We also sealcoat small commercial lots, HOA drives and multi-unit properties. The prep is the same: clean, fill the cracks, prime the oil spots and seal. We plan the timing with you so the lot can stay open, and certificates of insurance are available on request.
Already working with us on grounds maintenance or snow and ice management? Sealcoating can go on the same agreement.

Questions we hear a lot
How often should a driveway be sealcoated?
For most asphalt driveways, every two to three years. That is the interval sealcoat manufacturers recommend.
How long before I can drive on it?
Keep cars and foot traffic off for at least 24 hours. We will tell you when the driveway is ready to use.
When do you sealcoat?
In warm, dry weather: at least 50°F and rising, with no rain expected for 24 hours. Around here that means late spring through early fall.
Do you fill the cracks first?
Yes. Cracks are cleaned out and filled before the sealcoat goes on.
Do you seal concrete driveways?
No. Sealcoating is for asphalt (blacktop). Concrete needs a different kind of sealer.
Do you sealcoat commercial lots?
Yes. We sealcoat small commercial lots and HOA drives and plan the timing with you so the lot can stay open.
How much does sealcoating cost?
It depends on the size of the driveway and the shape it is in. We look at it and send you a written price before any work starts.
Tell us about your property
Send the form and we will get back to you to set up a time to see the property. Prefer to talk? Call or text Nick’s office.
- (708) 275-8972Call or text, Mon–Sat 9am–5pm
- [email protected]Photos of the area are welcome
